Timberline Surveying is currently under contract with Pike Energy Solutions for Idaho Power and Rocky Mountain Power on the B2H Transmission Line, which begins at the Hemingway Substation southwest of Boise, Idaho and ends near Boardman, Oregon.

Timberline Surveying is currently providing a control network to be used for all surveying involved in this project which is in excess of 300 miles of new transmission line. This includes processing our established Control Network, which includes 99 Control Points referenced to 13 CORS stations. We utilized OPUS when available as a check. We are coordinating access with the State, Federal, and private owners.