     Common Services:

Airports
Boundary Resolution
Construction
Control Networks
Flood Certification
Mining
Municipalities
Residential
Utility
Surveying for Airports >






Past Projects:

WINNEMUCCA
AIRPORT, Winnemucca, Nevada
Armstrong & Associates, Brad Rickard                                        
Timberline Manager:  Kenneth Cook
Client since:  March 2004
Timberline was to locate project control and establish new control for construction. Topographic survey of;

  • Two (2) miles of runways with solid elevations
  • All taxiways, apron, helipads and buildings
  • All signs, runway and taxiway lighting and all associated electrical
  • All perimeter fences

BATTLE MOUNTAIN AIRPORT, Battle Mountain, Nevada
Road & Highway Builders, Steve Blakley                                     
Timberline Manager:  Kenneth Cook

Client since:  August 2004

Scope of work:
Construction staking for;

  • Removal of taxiway bravo, and portions of taxiway alpha and charlie
  • Multiple layers of taxiway bravo, charlie 1, delta, echo, and portions of taxiway alpha and Charlie to a tolerance of 0.01 feet
  • subgrade
  • subbase course
  • aggregate base course
  • asphalt ( two layers)
  • Taxiway lights, signs, and associated electrical (vaults, pull boxes, ducts and handholds)
  • Drainage swales, crossing culverts, and head walls
  • All pavement paint markings (runway and taxiway)

BATTLE MOUNTAIN AIRPORT, Battle Mountain, Nevada
Reynolds, Smith & Hill Inc. (RS&H), Lew Lott                               
Timberline Manager:  Kenneth Cook
Client since:  July 2005

Timberline was to verify existing project control and establish new control for construction and topographic survey for future taxiway construction.

WINNEMUCCA AIRPORT, Winnemucca, Nevada
C.R. Drake and Sons, David Hartmann                                        
Timberline Manager:  Kenneth Cook
Client since:  October 2006                        

Timberline was to verify existing project control and establish new control for construction.
Construction staking for;

  • Location of taxiway lights
  • Location of all taxiway sighs
  • Location of all PAPI and REIL

ELKO REGIONAL AIRPORT, Elko, Nevada
Road & Highway Builders, Steve Blakley                                   
Timberline Manager:  Kenneth Cook
Project Engineer: Kimberley Horn  (Kevin Phelps)
Client since:  May 2006

Timberline was to locate project control and establish new control for construction.  Construction staking for:

  • Removal of taxiway alpha, foxtrot and a portion of taxiway hotel
  • Multiple layers of taxiway Alpha, foxtrot and a portion of taxiway hotel to a tolerance of 0.01 feet
  • subgrade
  • subbase course
  • aggregate base course
  • asphalt ( two layers)
  • Taxiway lights, signs and associated electrical (vaults, pull boxes, ducts and handholds)
  • Drainage swales, crossing culverts, and head walls

BATTLE MOUNTAIN AIRPORT, Battle Mountain, Nevada
Reynolds, Smith & Hill Inc. (RSH), Lew Lott                                  
Timberline Manager:  Kenneth Cook                                 
Client since:  June 2007
Topographic survey for;

  • Rebuilding of taxiway alpha
  • Runway lighting for runway 12/30
  • Construction of new parameter fence
  • Project as-built on a 50 foot grid

      1.  Centerline
2.  Quarter crown
3.  Edge of pavement